Proof Checking

Highways & Expressways

Rehabilitation & Up-gradation to 2/4 lanes configuration of Nagaj - Jath - Muchandi road, Section of NH-166E in the State of Maharashtra (Length – 48.498 km).

  • Length: 48.498 kms
  • Configuration: 2/4 lane
  • Project Cost: Rs. 243 Cr.
  • Client: MoRTH, New Delhi

Independent Engineer for Upgradation of Road for World Famous Lonar Lake, SH-51 in Buldhana District (Deulgaon Raja - Sindkhed Raja - Dusarbid - Lonar to Buldhana District Border, Length 48.50 Km) in the State of Maharashtra on Hybrid Annuity Mode (Package No. AM-76).

  • Length: 48.50 kms
  • Configuration: 2 lane with paved shoulder / 4 lane
  • Project Cost: Rs. 135.50 Crs.
  • Client: PWD, Govt. of Maharashtra
  • Other Features if any: The Project establishes the connection to Sindkhed Raja, the birth place of Rajmata Jijabai Bhosale and the World Famous Lonar Lake.

Rehabilitation & Up-gradation of 2/4 lanes with paved shoulder configuration for Dahegaon - Kuhi - Umred, Section of NH-247 in the state of Maharashtra.

  • Length: 44 Km
  • Configuration: 2 lane with paved shoulders / 4 lanes
  • Project Cost: Rs. 140 Crs.
  • Client: PWD, Govt. of Maharashtra

Independent Engineer for Improvement of (A) Ring Road in Yavatmal District (Yavatmal Bypass, Length 14.72 Km. (B) Yavatmal - Babhulgaon - Kalamb road, Length 34.23 Km in Yavatmal District in the State of Maharashtra on Hybrid Annuity Mode (Package No. AM-89 A&B).

  • Length: 47.69 Km
  • Configuration: 2 lane with paved shoulders / 4 lanes
  • Project Cost: Rs. 190.19 Crs.
  • Client: PWD, Govt. of Maharashtra

OTHER PROJECTS

  • Independent Engineer for Improvement of Aatpadi to Salgare (SH-153), Km 65/503 to km 135/500 in Sangli District in the State of Maharashtra on Hybrid Annuity Basis (Package No. PN- 41).

  • Independent Engineer for Improvement of Arwade to Dighanchi (SH-151), Km 63/000 to Km 127/950 in Sangli District in the State of Maharashtra on Hybrid Annuity Mode (Package No. PN-44).

  • Independent Engineer for Improvement of
    • (i) Safale – Manda -Tembhi – Khodave, Km 0/000 to Km 9/100
    • (ii) Nandore – Mann – Kallole, Km 0/00 to Km 9/200
    • (iii) Parnali – Palghar road Km 0/00 to Km 14/900
    • (iv) Chinchani – Ashagad – Udhva, Km 0/00 to Km 34/500 in Palghar District in the State of Maharashtra on Hybrid Annuity Mode (Package No. MU-01).

  • Independent Engineer for Improvement of
    • (i) Shahapur – Shenwa – Dolkhamb – Chondha – Sangamner – Shegaon – Nanded – Dharmabad Road, SH-50, Km 0/000 to Km 38/000
    • (ii) Kambare – Piwali – Washind Road, MDR-57, Km 0.00 to Km 23.600 in Thane District in the State of Maharashtra on Hybrid Annuity Mode (Package No. MU-04).

  • Independent Engineer for Improvement of
    • (i) Bhoyegaon – Gadchandur – Jiwati Road (Length 21 Km),
    • (ii) Gadchandur – Patan – Wani Road (Length 53 Km) in Chandrapur District in the State of Maharashtra on Hybrid Annuity Mode (Package No. NAG-142).

  • Independent Engineer for Improvement of
    • (i) Bari to Sangamner, Length 67.60Km and
    • (ii) Randhafall to Varanghushi, Length 16.230Km in Ahmednagar District in the State of Maharashtra on Hybrid Annuity Mode (Package No. NSK-71).

  • Proof Checking for Construction of SH-54 (NH-348A) from Km 6/400 to Km 13/200 and Amra Marg (NH-346A) from Km 0/000 to Km 5/400 – Package III.