Proof Checking of Structural Designs
Bridges/RoBs/Flyovers
6 Lane Lakhani Flyover 3.5 Km & Sakoli Flyover 2.9 Km along Nagpur-Raipur Section, Nagpur.
- Scope of Work:- Proof Checking of Structural Design & Drawings
- Client:- JMC Projects (India) Pvt. Ltd.
(Principal Client- NHAI) - Salient Features :-
- Total Length :-
3.5 Km (6 Lane – Lakhani Flyover)
2.9 Km (6 Lane – Sakoli Flyover) - Length of Maximum Span :- 36.6 m
- Total Cost :- Rs. 241Cr.
- Type of Superstructure :-
Pre-cast PSC Segmental Box Girder
- Total Length :-
Flyovers at Rajnoli & Mankoli junction along NH-3, Thane. (8 Lane Flyovers)
- Scope of Work:- DPR, PMC & Proof Checking of Structural Design & Drawings
- Client:– Mumbai Metropolitan Region Development Authority (MMRDA)
- Salient Features :–
- Total Length :-
637 m (8 Lane – Mankoli Flyover)
653 m (8 Lane – Rajnoli Flyover) - Length of Maximum Span :- 50 m
- Total Cost :- Rs. 155 Cr.
- Type of Superstructure :-
Structural Steel Girder for Obligatory Span (50m)
Pre-cast PSC I – Girder for Remaining Span
- Total Length :-
OTHER PROJECTS
- Proof Checking of various bridges of JNPT Road (NH-348A & NH-346A) – Package III, Jasai Flyover, {anvel Creek, Ambuja Flyover, Navi Mumbai.
- High Level Four lane New Khandepar Bridge, 2 Flyovers & 4 Vehicular Underpass on NH–4A (NH-748) in the State of Goa.
- High Level Two Lane Wainganga River Bridge between Roha-Mundhari (i.e. Dist – Bandhara) in the State of Maharashtra
- Proof Checking of Integrated Structures on Both Sides of Chandani Chowkh Junction, Pune in the State of Maharashtra
- Elevated Corridor from Rajiv Gandhi Chowk to Sai Baba Temple at Bhivandi Thane. (PSC Segmental Girder Bridge- 3.30 Km Length)
- Flyover at Amarmahal Junction joining SCLR and Eastern Expressway, Mumbai. (90m S-Curve Steel Superstructure)
- River Bridge cum Flyover at Holkar Bridge, Pune.
- 4 Nos. Grade Separator between Raipur-Durg section of NH 53, Chhattisgarh (Bow String Girder Superstructure )
- Flyover at Santacruz -Airport Junction along Western Express Highway, Mumbai. (Pre-cast Segmental Girder)
- Kamraj Nagar to DN Nagar Corridor Mono Rail Project (Package AC02), Mumbai.