Detailed Structural Design:

Bridges/RoBs/Flyovers

River Bridge cum Flyover at Jilani Complex, Surat.

  • Scope of Work: DPR & Detailed Design.
  • Client: Surat Municipal Corporation
  • Salient Features:
    • Total Length: 2100 m (4 Lane)
    • Length of Maximum Span: 50 m
    • Total Cost: Rs. 190.8 Cr.
    • Type of Superstructure: Precast PSC I Girder 50m Span & Cast-in-situ PSC Voided slab in Flyover portion.
  • Remark: This project involves Double Decker Bridge in Flyover portion.

ROB at Kopri (Railway Portion) along Eastern Express Highway, Thane (8 Lane ROB)

  • Scope of Work:– DPR & Detailed Design for Railway Span
  • Client:– Mumbai Metropolitan Region Development Authority (MMRDA)
  • Salient Features :
    • Total Length :- 785 m
    • Length of Maximum Span :- 63m,
    • Total Cost :- Rs. 150 Cr.
    • Type of Superstructure :- composite steel girders
  • Remark:– This is 8 lane ROB on Eastern Express Highway having very heavy traffic volume.

Flyover at Mahavir Chowk, Aurangabad.

  • Scope of Work:
    Detailed Structural Design
  • Client:– Shri Satya Saibaba Construction
  • Salient Features :-
    • Total Length :- 655 m
    • Length of Maximum Span :- 50m,
    • Total Cost :- Rs. 31.65 Cr.
    • Type of Superstructure :-
      Cast-in-situ PSC Box Girder in obligatory span &
      Pre-cast PSC I-girder in remaining span

OTHER PROJECTS

  • Flyover at the junction of Veer Savarkar Bridge and S. V. Road Goregaon-Mumbai. (Steel Superstructure)
  • Flyover at the junction of N. S. Phadke Marg and Telli Galli, Andheri –Mumbai. (Steel Superstructure)
  • Flyover at Mahavir Chowk, Aurangabad. (4 Lane Flyover with 50m obligatory span)
  • Pune Metro between Civil Court to Ramwadi, Pune (Special Span – Steel Superstrucutre)
  • Patri Pool ROB, Katai Naka ROB & Palava Flyover on Shilphata to Bhiwandi Road, Kalyan-Thane.
    (Steel Superstructure – 76.67m Span N-Type Truss)
  • Widening and Reconstruction of ROB along GMLR near Nahur Railway Station, Mumbai.
    (Steel Superstructure – 72.0m Span Girder)
  • ROB at Vikroli Railway Station, Vikroli – Mumbai.
  • Railway Bridges (3 Nos.) in Formation for 2 X 300 MW Butibori TPP, Nagpur.
  • ROB at Milan Subway across Western Railway Line, Mumbai.
  • Civil Court to Ramwadi, Elevated Corridor II of Pune Metro, Pune.
  • Grade Separator at Baka-wolf Chowk (Old NH-4), Pimpri Pune.