Detailed Design:
Highways & Expressways
Construction of Mumbai-Pune Expressway, Kon to Kalamboli bypassing Panvel town Package-I.
- Length: 8.10 kms
- Configuration: 6 lane Expressway
- Project Cost: Rs. 90 Crs.
- Client: Maharashtra State Road Development Corporation Ltd., Mumbai
- Other Features if any: India’s first six-lane concrete, high-speed, access controlled expressway.
Four Laning of Satara - Kolhapur up to Maharashtra State Border, Section of NH-4, Package-II from Km 616/000 to Km 639/000.
- Length: 23 kms (includes 2 Flyovers & 2 Major River Bridges)
- Configuration: 4 lane
- Project Cost: Rs. 112 Crs.
- Client: Maharashtra State Road Development Corporation Ltd., Mumbai
- Other Features if any: The project was part of Golden Quadrilateral Delhi – Kolkatta – Chennai – Mumbai
Consultancy services for Design and Construction of Bypass road for Mehkar Town.
- Length: 7.50 kms (includes Major Bridge across Painganga river)
- Configuration: 2 lane
- Project Cost: Road Rs. 39.50 Crs.
- Client: MSRDC Ltd., Nagpur
Design Consultancy Services for Widening, Strengthening and Up-gradation of Shilphata to Bhiwandi Road from 4 to 6 laning from Chainage 0/000 to 21/058 in the State of Maharashtra on EPC mode.
- Length: 21 kms
- Configuration: 6 lanes
- Project Cost: Rs. 195.20 Crs
- Client: M/s Global Zone Sanitary Infrastructure Pvt. Ltd for MSRDC Ltd.
Design Consultancy Services for Improvement of
- Shembal Pimpari – Pusad, Gunj – Mahur road, Package AM-1A,
- Digras – Pusad and Darwha – Ner road, Package AM-1B,
- Yavatmal – Kolambhi – Ghatanji road, Pandharkawada – Shibla – Zari – Jamani, Package AM-1C
- Yavatmal – Dharwa – Kupta road, Package AM-1D
- Kupata – Mangrul Pir road, and Karanja – Manora road, Package AM-1E in Yavatmal and Washim Districts, Total Length 306.497 Km in the State of Maharashtra on Hybrid Annuity Mode.
OTHER PROJECTS
- Up-gradation of Road joining two District places in Akola and Buldhana District (Warwand Undri Ambe Takali Balapur), SH-274 & SH-269, Length:- 69.552 Km in the State of Maharashtra on Hybrid Annuity Mode.
- Improvement to Musalifata Dharangaon Amalner Betawad road SH-6 Km. 0/00 to 61/00 to 2 / 4 lanes in the state of Maharashtra on Hybrid Annuity Mode (Package No. NSK-63).
- Improvement to Mehergaon – Dhule – Amelner – Chopada – Khargaon road, Km. 0/000 to Km 64/790 and Ajang – Ambonda – Nawalnagar, Km. 0/000 to Km 106/350 in Dhule District in the State of Maharashtra on Hybrid Annuity Mode (Package No. NSK-58).
- Improvement of various Major Roads in Asphalt Macadam, Cement Concrete, UTWT and Side Strips of Cement Concrete Roads in Mastic Asphalt in K/East, P/ South and P/ North Ward for the year 2014-2015.
- Consultancy Services for Design of Pavement for roads in Zone I & II in Mumbai for period from 2006 to 2008.